预防工地围挡出现倒塌的措施

来源:http://www.jnpfjc.com/   发布时间:2022-09-28

在建筑工地上要以为主的,为了防止工地围挡的倒塌工作,我们防范措施一定要做好,这样可以打打地降低险情隐患、减少施工围挡倒塌的灾害损失,那么我们应该如何做呢?济南围挡小编为大家详细解说!
On the construction site, we should focus on safety. In order to prevent the collapse of the fence on the construction site, we must take good preventive measures, so as to reduce the potential danger and reduce the disaster loss caused by the collapse of the fence. What should we do? Jinan Fen Fen Xiaobian explains in detail!
1、按照指挥部要求增加每片围挡背面固定支撑,每片围挡背面支撑多增加三根方管,围挡底脚、背面都采取三角铁、方管与路边的防撞护栏柱焊接成一体的方式固定。
1. According to the requirements of the headquarters, the back fixed support of each enclosure shall be added, and three square tubes shall be added to the back support of each enclosure. The footing and back of the enclosure shall be fixed by welding triangular iron, square tubes and anti-collision guardrail posts at the roadside.
2、工地围挡支架固定的铆钉密度,工地围挡外侧增加与地面角铁固定密度。
2. The rivet density for fixing the site enclosure support shall be increased, and the fixed density with the ground angle iron shall be increased outside the site enclosure.
3、把原有每十片围挡设置一块空心围挡改为每三片围挡设置一块空心围挡,减少风的阻力。
3. Change the original one hollow enclosure for every ten enclosures to one hollow enclosure for every three enclosures to reduce wind resistance.
济南围挡
4、在每两片围挡之间设置带有箭头指示方向的红色反光警示标志,利于夜晚行车,另外每500米围挡上方设置一块直径80CM的限速30KM或“慢”的标志。
4. A red reflective warning sign with the direction indicated by the arrow shall be set between every two fences to facilitate the safety of driving at night. In addition, a sign with a diameter of 80cm and a speed limit of 30KM or "slow" shall be set up every 500m above the fence.
5、加强每天上路巡查力度,对发现围挡有破损或倾倒倾覆的情况及时进行修复和修正加固,坚决把施工围挡倒塌和造成人员伤害的可能性降低到小。
5. Strengthen daily road patrol, repair and reinforce the damaged or overturned enclosure in time, and resolutely reduce the possibility of construction enclosure collapse and personal injury.
6、项目部认真做好天气变化资料的收集和发布,特别是台风、暴雨等恶劣气象情况更要及时发布和告知,以便于采取更为积有效的应对措施。
6. The Project Department shall carefully collect and publish the weather change data, especially the severe weather conditions such as typhoon and rainstorm, so as to take more effective countermeasures.
7、项目部加强人员值班和机械车辆管理工作。项目部在台风和暴雨期间安排专人24小时值班,值班室设立在项目部办公室,固定电话,应急小组成员手机24小时开机状态;项目部机械车辆都投入防施工围挡倒塌事件中,平时在生产中做好维修保养工作,临警好用。
7. The Project Department shall strengthen the management of personnel on duty and mechanical vehicles. The Project Department shall assign special personnel to be on duty 24 hours a day during typhoon and rainstorm, and the duty room shall be set up in the office of the Project Department, with fixed telephone and mobile phones of emergency team members switched on 24 hours a day; The machinery and vehicles of the Project Department are put into the construction fence collapse prevention event, and the maintenance work is done well in the production at ordinary times, and the temporary police are easy to use.
预防工地围挡倒塌,我们可以从以上几点来进行预防,希望对大家有帮助,想了解更多信息,欢迎来电咨询我们http://www.jnpfjc.com
We can prevent the collapse of the fence on the construction site from the above points. We hope it will be helpful to everyone. If you want to know more information, please call us http://www.jnpfjc.com !